Add work items from iteration/sprint
Work items can now be added from an iteration with these 2 new features:
- Add work items in the UI from a selected iteration
- New Current iteration build task work item source
Here is what these are all about:
Add work items from a selected iteration
You can now add work items directly from one of your iterations via the Bravo Notes UI. Click Add in the work items tab, choose a team and iteration and all work items selected for that iteration will be added to Bravo Notes.
New Current iteration build task work item source
In the Bravo Notes build task you now have these additional options in the work item source input:
- Iteration: Current
- Iteration: Current - 1
- Iteration: Current + 1
When running the build task with Iteration: Current option selected, all work items from the current iteration of the selected team will be used to generate a document.
Using the Iteration: Current -1 will do the same for the last iteration while Iteration: Current + 1 will load work items from the next iteration.
These new options are particularly useful for generating iteration/sprint-based documents on a schedule.